Jannah Theme License is not validated, Go to the theme options page to validate the license, You need a single license for each domain name.
LocalNews

Lagos govt to commence repair works on Apapa-Oshodi Expressway

Bad roads
Bad roads
Lagos State Public Works Corporation (LSPWC) said on Saturday that it would commence repair works on the bad portions of Apapa/Oshodi Expressway in April.
LSPWC Special Adviser/Chief Executive Officer, Mr Ayotunde Sodeinde, in Lagos that already, the corporation had started extensive repairs works on Lagos-Badagry Expressway.
“We have started repairing over 10 bad spots on the Lagos-Badagry Expressway to reduce gridlock and hardship being faced by people plying the road.
“However, the present administration will commence the rehabilitation of Berliet axis of Apapa-Oshodi Expressway in April.
“Gov. Ambode’s administration is an all-inclusive government that wants all bad roads in the state to be fixed irrespective of its owner – federal, state or local.
“Hence, the urgent directive by the governor that the corporation should commence an extensive repair of Berliet axis of Apapa Oshodi Expressway, which has been in a terrible state for a long time,’’ he said.
The special adviser assured residents of Lagos that the corporation would continue road maintenance even with the approaching rainy season.
Sodeinde explained that materials more friendly with water such as paving stones and enforced concrete cement would be used on the roads.

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button