AGENE GODWIN, Benin
Residents of Lucky Way in Benin City, the Edo State capital, can now heave a sigh of relief due to the ongoing rehabilitation work to reconstruct their roads by state governor, Mr Godwin Obaseki.
The link road, connecting Ramat Park to Upper Mission, had been in horrendous shape for years and had caused severe heartache, with several motorists and residents noting that the road could not get any worse.
Benedict Okeke, a tricycle rider plying Lucky Way lamented the road’s condition, saying: “We take our tricycles for repairs on daily basis because of the dilapidated state of the road. Most importantly, we the few riders left no longer find passengers to carry. The road is a death trap to motorists and tricycle riders.”
Commending Governor Godwin Obaseki, Okeke said: “Now that we are aware that Governor Obaseki has deployed contractors to the road, l feel very happy. We thank the state governor for the good work he’s doing in the state. Now, everybody is happy over this recent development.”
Unable to contain his excitement, Mr. Ibeto, a tradesman, who was looking on as Pastor Aigbokhan spoke, chipped in that: “For the past 12 years, we expected the government’s presence. Tricycles and pedestrians could not access the road”.
A welder, Mr Joseph Odion, reacting to the ongoing repair of Lucky Way, revealed that for more than 13 years, he had been working as a welder and fabricator, even before the road was constructed and that lack of proper drains incited the erosion that eventually destroyed the road upon construction.
He said: “Businesses are distorted because of the heavy erosion. Tricycle and bus drivers take advantage of the road and increase their transport fares. Seeing contractors on site, working, makes me very happy. Obaseki does not talk, but you can see him working.”
Commenting on the reconstruction going on at the road, Engineer Ben, the contractor and site engineer from Glatrico International Limited, said: “We met this road, Lucky Way, in a very dilapidated position. It is not what the inhabitants can use. Everywhere is flooded. All the drains are clogged up. The road is totally out of use”.
The stretch of the road is three kilometres from the Ramat Park end to Upper Mission, the terminal point of the job. A new side drain will be done and be channeled underground to the drainage located at Auchi-Benin Road. A deep manhole of about 12 meters depth will be constructed to take the entire water to Ikpoba dam.